TM 1-1730-201-13&P
FIELD MAINTENANCE
MAINTENANCE PLATFORM, TYPE B-1
PART NO. 50-19080 NSN 1730-00-390-5618 EIC: NA
SERVICE UPON RECEIPT
INITIAL SETUP:
References (cont.)
References
SERVICE UPON RECEIPT OF MATERIEL
UNPACKING
1.
Remove the maintenance platform from the shipping crate.
2.
Assemble the upper structure assembly (WP 0013 00) and with a suitable hoist, lift the upper structure onto
3.
Secure the hydraulic cylinder assembly (WP 0012 00) to the hydraulic reservoir with the hydraulic pivot pin.
4.
5.
CHECKING UNPACKED EQUIPMENT
NOTE
Pay particular attention to any evidence of excessive wear and broken, missing, or bent parts.
Repair or replace excessively worn or unserviceable parts.
1.
Inspect hydraulic lines and ttings for leaks.
Inspect tires for proper ination: if necessary, inate to 40 psi.
2.
3.
Inspect frame structure and welds for breaks.
4.
Inspect for, and tighten, any loose nuts or bolts.
PRELIMINARY CHECKS AND ADJUSTMENTS
1.
2.
3.
4.
END OF WORK PACKAGE
0009 00-1/2 blank