• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STARTER INTERLOCK RELAY (CRSI)
PARK POSITION MOTOR CIRCUIT BREAKER (CB2)

Maintenance and Parts Manual For MT3 Standard Aircraft Towing System \(SATS\)
Page Navigation
  433    434    435    436    437  438  439    440    441    442    443  
img
. . . . . .
0122
TM 1-1740-221-13&P&P
POWER DISTRIBUTION BLOCK (FUSE/RELAY HOLDER) - (CONTINUED)
2.
Remove distribution box cover (Figure 2, Item 1).
3.
Locate headlight fuse (Figure 2, Item 5) 12FU 20 Amp, or reference decal inside distribution box cover.
4.
Carefully pull fuse from socket.
TAIL LIGHT FUSE (13FU)
1.  Disconnect battery negative cables (WP 0111).
2.  Remove distribution box cover (Figure 2, Item 1).
3.  Locate tail light fuse (Figure 2, Item 6) 13FU 20 Amp, or reference decal inside distribution box cover.
4.  Carefully pull fuse from socket.
HORN FUSE (11FU)
1.  Disconnect battery negative cables (WP 0111).
2.  Remove distribution box cover (Figure 2, Item 1).
3.  Locate horn fuse (Figure 2, Item 7) 11FU 5 Amp, or reference decal inside distribution box cover.
4.  Carefully pull fuse from socket.
PREHEAT FUSE (14FU)
1.  Disconnect battery negative cables (WP 0111).
2.  Remove distribution box cover (Figure 2, Item 1).
3.  Locate preheat fuse (Figure 2, Item 8) 14FU 5 Amp, or reference decal inside distribution box cover.
4.  Carefully pull fuse from socket.
END OF TASK
INSTALLATION
PARK RELAY (SHIFTER) (CRS)
1.  Line up Park Brake Relay pins with distribution socket.
2.  Carefully push relay CRS (Figure 2, Item 2, Relay A) into distribution box socket.
3.  Install distribution box cover (Figure 2, Item 1).
4.  Connect battery negative cables (WP 0111).
5.  Perform Maintenance Operation Check.
STARTER INTERLOCK RELAY (CRSI)
1.  Line up Starter Interlock Relay pins with distribution socket.
2.  Carefully push relay CRSI (Figure 2, Item 2, Relay B) into distribution box socket.
3.  Install distribution box cover (Figure 2, Item 1).
4.  Connect battery negative cables (WP 0111).
5.  Perform Maintenance Operation Check.
INTERLOCK RELAY (CRI)
1.  Line up Interlock Relay pins with distribution socket.
2.  Carefully push relay CRI (Figure 2, Item 2, Relay C) into distribution box socket.
3.  Install distribution box cover (Figure 2, Item 1).
4.  Connect battery negative cables (WP 0111).
5.  Perform Maintenance Operation Check.
TRANSMISSION CIRCUIT RELAY (CRT)
1.  Line up Transmission Circuit Relay pins with distribution socket.
2.  Carefully push relay CRT (Figure 2, Item 2, Relay E) into distribution box socket.
01224


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.