TM 1-1740-221-13&P&P
FIELD MAINTENANCE
OVERFLOW BOTTLE
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Engine Shut Down and Cool
Personnel Required
91B, Light Wheel Vehicle Mechanic
References
INSPECTION
Visually inspect the overlow bottle for mount security, leaks, deterioration and proper hose connection.
END OF TASK
REMOVAL
Figure 1. Overlow Bottle (Removal and Installation)
00591