TM 1-1270-476-30
4-45
4-3. TADS TURRET ASSEMBLY REPAIR (cont)
v. Starting at mounting position 1, torque each
mounting screw in order of installation to 40
in-lb.
w. Apply corrosion inhibitive sealing and
coating compound to two screwlock posts
(8) (para 2-6). Use class 1A application.
x. Install connector J8 (3) on shroud support
assembly bracket (4) with two screwlock
posts (8), four washers (7), two
Iockwashers (6), and nuts (5).
y. Apply corrosion inhibitive sealing and
coating compound to completely cover two
bonding strap assemblies (19) mounting
hardware (para 2-6). Use class 2
application.
END OF TASK