• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Power Pack Assembly (Removal And Installation)
POWER PACK ASSEMBLY - (CONTINUED)

Maintenance and Parts Manual For MT3 Standard Aircraft Towing System \(SATS\)
Page Navigation
  150    151    152    153    154  155  156    157    158    159    160  
img
0031
TM 1-1740-221-13&P&P
POWER PACK ASSEMBLY - (CONTINUED)
Figure 8. Power Pack Assembly (In Stand)
END OF TASK
INSTALLATION
WARNING
Use extreme caution when lifting heavy components. Never permit any part of the body to be
positioned under and engine, transmission being lifted or suspended. Use suitable lifting
equipment for heavy components. Power pack weight is 1800 lbs.
NOTE
To ease with the power pack assembly lifting process, use slings or chains of proper length (as
shown 3 foot length in front and 4 foot length in rear).
1.
Attach sling to power pack assembly lifting eyelets (Figure 6).
2.
Attach overhead hoist to sling (Figure 6).
3.
Lift power pack assembly and position over vehicle chassis (Figure 7).
4.
Carefully lower power pack assembly into tow tractor while continuously observing that all harnesses, hoses
and pipes are not interfering with power pack frame.
NOTE
Ensure cradle mount holes are aligned with frame mount holes.
00319


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.