TM 55-1680-320-23&P
2-126.2 Change 8
2-60. HOIST CABLE ASSEMBLY - REPLACE (cont)
2-60
This task covers:
Removal and Installation
INITIAL SETUP
Personnel Required:
Equipment Condition:
67N, UH1 Helicopter Repairer (2)
67T, UH60 Helicopter Repairer (2)
Hoist installed in helicopter or assembly stand
Cable hook assembly removed.
Parts/Materials:
Equipment Condition Para:
Insulation Sleeving (Item 14, App. D)
Petrolatum (Item 19, App. D)
Screw, AN3H26A (Item 5, App. D)
Task 2-5
Task 2-58
Tools and Test Equipment:
References:
Tool Set, Aviation Unit Maintenance
NSN 4920-00-567-0467
Aircraft Electrical and Electronic Manual
TM 55-1500-323-24
Tool Kit, Aircraft Mechanic
NSN 5180-00-323-4692
Cable spool, 42277-730 or equivalent
Ground Power Unit (GPU)
1. Removal.
WARNING
Rescue hoist cable cutter contains an
explosive cartridge. Use extreme care
when handling to prevent injury to per-
sonnel. Static producing clothing pro-
hibited. Install piece of aluminum foil
between cartridge pins when discon-
necting harness.
a. Disconnect cable cutter harness from cable
cutter
b. Remove pressure roller cover (1) from boom
head assembly (7) by removing screws (2, 3)
and washers (4).
c. Remove cable cutter cap (5) and anvil (6)
GO TO NEXT PAGE