• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Oil Pressure (Gauge) Sending Unit (Removal and Installation)
FLYWHEEL

Maintenance and Parts Manual For MT3 Standard Aircraft Towing System \(SATS\)
Page Navigation
  179    180    181    182    183  184  185    186    187    188    189  
img
. .
0038
TM 1-1740-221-13&P&P
OIL PRESSURE SENDING UNIT (GAUGE) - (CONTINUED)
6.
Secure wire to sending unit stud (Figure 1, Item 3) with nut (Figure 1, Item 4).
7.
Connect battery negative cables (WP 0111).
8.
Perform Maintenance Operation Check.
9.
Close engine cover (WP 0028).
END OF TASK
END OF WORK PACKAGE
00383/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.