TM 1-1730-223-13&P
0015 00
INSTALLATION
1.
Lift handrail and supports into position and align supports (Figure 2, Item 1) with mounting points at rear legs
(Figure 2, Item 3).
2.
Secure supports to rear legs (Figure 2, Item 3) by tightening setscrews (Figure 2, Item 2).
REMOVAL
WORK PLATFORM
Figure 3.
Work Platform.
1.
Remove platform rails from platform.
2.
Remove self-locking nut (Figure 3, Item 1), flat washer (Figure 3, Item 2), and shoulder screw (Figure 3, Item
3) from each rear leg (Figure 3, Item 4).
3.
Lift rear of platform (Figure 3, Item 10) and remove adapter (Figure 3, Item 11).
0015 00-3