TM 55-1680-320-23 & P
2-4. SERVICE UPON RECEIPT OF MATERIAL (cont)
2-4
d. With a helper, lift hoist from shipping con-
tainer.
e. Place rescue hoist on a suitable work surface
(or in hoist assembly stand, Part Number
42277-808 or equivalent, in accordance with
Task 2-5) for inspection.
2. Checking Unpacked Equipment.
a. Inspect the hoist for damage incurred during
shipment. If the equipment has been damaged,
report the damage on DD Form 6, Packaging
Improvement Report.
b. Check the hoist against packing slip to see if
shipment is complete. Report all discrepancies
in accordance with instructions of DA PAM
738-751.
c. Check all tags and forms accompanying the
hoist to determine the reason for removal frorn
service.
d. Do not remove any forms or tags that are
attached to the hoist until unit is installed and
ready for operation.
When installed, remove
forms and tags and forward to Quality Control
(QC) section office.
FOLLOW-ON MAINTENANCE:
None
END OF TASK
2-3