TM 55-1680-320-23&P
2-6. PRELIMINARY SERVICING OF EQUIPMENT
2-6
This task covers: Preliminary Servicing and Adjustment of Equipment
INITIAL SETUP
Personnel Required:
Equipment Condition:
67N, UHl Helicopter Repairer (2)
Hoist installed in helicopter
67T, UH60 Helicopter Repairer (2)
Parts/Materials:
Equipment Condition Para:
None
Task 2-5
Tools and Test Equipment:
References:
None
None
a.
b.
c.
The hoist cable cutter contains an
explosive cartridge. Use extreme
caution when handling to prevent
injury to personnel. Spark or static
producing clothing is prohibited.
Check rescue hoist lubricating oil levels by
looking at level sight gauge located on winch
assembly (1). Service hoist in accordance with
lubrication instruction plates located on the
boom head (2) and winch (3) assemblies.
Inspect electrical cables and connectors to en-
sure proper electrical interconnection. Check
for damage and repair as required prior to per-
forming any operational procedures.
Ensure electrical cable harnesses are properly
routed free of obstruction and clear of moving
parts. Ensure harnesses are properly and
securely fastened to hoist.
GO TO NEXT PAGE
2-6
