TM 55-1680-320-23 & P
3-24. MICROSWITCH ASSEMBLY (FULL UP) - REPLACE
3-24
This task covers: Removal and Installation
INITIAL SETUP
Personnel Required:
67N, UH1 Helicopter Repairer
67T, UH60 Helicopter Repairer
68F, Aircraft Electrical Repairer
Parts/Materials
Electric Braid (Item 11, App. D)
Heat Shrink Tubing (Item 26, App. D)
Packing, M83461/1-127
Packing, MS28775-156
Packing, MS28775-013
Tools and Test Equipment:
Tool Kit, Aircraft Mechanics,
NSN 5180-00-323-4692
Shop Set, Intermediate Maintenance
NSN 4920-00-472-4183
Tool Kit, Electrical Repairer
NSN 5180-00323-4915
Equipment Condition:
Hoist insta1led in assembly stand
Boom head assembly removed
Actuator assembly removed
Equipment Condition Para:
Task 3-5
Task 2-20
Task 2-25
References:
None
1. Removal.
a.
b.
Remove screws (1), washers (2) and
nutplate assemblies (3).
Carefully remove actuator leaves (4, 5)
from microswitch assemblies (6, 7) on
wiring harness assembly (8).
GO TO NEXT PAGE
3-83