TM 55-1680-320-23 & P
3-24. MICROSWITCH ASSEMBLY (FULL UP) - REPLACE (cont)
3-24
o.
p.
q.
Lubricate side cover packings (15) and install
on side cover assemblies (11).
Install side cover assemblies (11 ) and secure
using bolts (12) and washers (13). Torque
bolts to 20-25 in-lbs.
Install actuator leaves (4) and position with
microswitch assemblies(5) into boom housing.
Secure using screws (1), washers (2) and
nutplates (3).
FOLLOW-ON MAINTENANCE:
Install boom head assembly
(Task 2-20)
Install actuator assembly
(Task 2-25)
Test microswitch assemblies
(Task 2-26)
END OF TASK
3-88