• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THROTTLE PEDAL ASSEMBLY
THROTTLE RESERVOIR

Maintenance and Parts Manual For MT3 Standard Aircraft Towing System \(SATS\)
Page Navigation
  446    447    448    449    450  451  452    453    454    455    456  
img
. . . .
0126
TM 1-1740-221-13&P&P
THROTTLE MASTER CYLINDER/PEDAL ASSEMBLY - (CONTINUED)
3.
Turn throttle master cylinder (Figure 1, Item 8) rod clockwise into the rod clevis.
4.
Position clamp (Figure 1, Item 3) on master cylinder.
5.
Install bolt, lock washer and nut (Figure 1, Item 9, 10 and 11) and tighten.
6.
Tighten cylinder rod jam nut (Figure 1, Item 4 not shown).
7.
Wrap threads of hose ittings (Figure 1, Item 12) with anti-seize tape.
8.
Install 2 cylinder hose itting (Figure 1, Item 12) in same position as noted during removal.
9.
Install supply hose (Figure 1, Item 1).
10.
Install pressure hose (Figure 1, Item 2).
11.
Bleed throttle system (WP 0124).
12.
Connect battery negative cables (WP 0111).
13.
Remove chocks.
14.
Perform Maintenance Operation Check.
THROTTLE PEDAL ASSEMBLY
1.  Position pedal assembly (Figure 1, Item 4).
NOTE
Pedal assembly mount nuts are accessed from under the vehicle.
2.
Install 3 pedal mount bolts and nuts (Figure 1, Item 7 and 8).
3.
Install supply hose (Figure 1, Item 1).
4.
Install pressure hose (Figure 1, Item 2).
5.
Bleed throttle system (WP 0124).
6.
Connect battery negative cables (WP 0111).
7.
Remove wheel chocks.
8.
Perform Maintenance Operation Check.
END OF TASK
END OF WORK PACKAGE
01263/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.