0050
TM 1-1740-221-13&P&P
OIL COOLER - (CONTINUED)
INSTALLATION
WARNING
The use of Personal Protective Equipment (PPE) is required when using or handling hazardous
materials associated with operating and maintaining equipment (jet fuel, hydraulic luid, brake
luid, ethylene glycol, cleaning solvents, compressed air, and engine/axle oil). Failure to use
PPE when handling these materials could result in injury or death.
1.
Position oil cooler on bracket.
2.
Install 4 bolts (Figure 1, Item 9).
3.
Install 4 rubber vibration mounts (Figure 1, Item 10).
4.
Install 4 lat washers (Figure 1, Item 6).
5.
Install 4 lock washers (Figure 1, Item 8).
6.
Install 4 nuts (Figure 1, Item 7) and tighten.
7.
Wrap threads of 2 itting (Figure 1, Item 3) with anti-seizing tape.
8.
Stand cooler and ill with transmission luid.
9.
Install 2 itting assemblies (Figure 1, Item 2 and 3) and cap.
10.
Raise the cooler into position from underneath the vehicle.
11.
Install 2 upper cooler mounts (Figure 1, Item 11).
12.
Install 2 lower cooler mounts (Figure 1, Item 11).
13.
Remove cooler itting caps.
14.
Install hose(Figure 1, Item 5) onto itting (Figure 1, Item 2).
15.
Install hose (Figure 1, Item 1) onto itting (Figure 1, Item 2).
16.
17.
18.
Perform Maintenance Operation Check.
19.
END OF TASK
END OF WORK PACKAGE
00503/blank