TM 55-1680-320-23&P
Change 8 3-153/(3-154 blank)
3-46. PREPARATION FOR STORAGE OR SHIPMENT
3-46
4. Packaging.
WARNING
When hoist is packaged for shipment or
storage, refire kit, P/N 42277E182. Refer-
ence in change 3. page C-3-2 Item Num-
ber 74A is to be removed from the cable
cutter. The cable cutter, P/N 42277E336
may be left in hoist but the refire kit which
is an explosive charge and component of
the cable cutter must be removed prior to
shipment or storage. In addition storage
case should be marked externally to indi-
cate that explosive charge has been
removed.
a. Place rescue hoist reusable shipping con-
tainer, Part Number 42305R11 on a flat sur-
face. Allow adequate work space for installa-
tion of rescue hoist.
b. Lift three overcenter latch handles (1) and un-
latch to release top of shipping container (2).
c. Grasp top of shipping container (2) and lift up
to open.
d. With a helper, lift hoist and place into shipping
container.
e. Secure cable hook in container using internal
retaining strap.
f. Ensure material condition tag is securely
attached to hoist. Close top of shipping con-
tainer (2) and secure using three overcenter
latch handles (1).
FOLLOW-ON MAINTENANCE:
None
END OF TASK