TM 55-1680-320-23 & P
2-64. DRUM ASSEMBLY - ALIGN (cont)
2-64
6. If hoist cable contacts inside surface of cable cutter,
adjust drum alignment as follows:
a.
b.
c.
d.
Remove lockwire from screws (10) and discard.
Remove screws, washers (11). Pull bearing
retainer (12) away from stationary gear (13).
Place a suitable tool into hole of stationary
gear (13) and bearing retainer (12) and rotate
stationary gear assembly (18) in the clockwise
(or counter-clockwise) direction as required to
obtain cable clearance.
Repeat steps 4 and 5 to ensure proper alignment
and Clearance.
Position bearing retainer (12) onto stationary
7.
8.
gear assembly (13). Install washers (11) and
screws (10). Secure screws using lockwire.
Install cable cutter cap (7) and anvil (8).
Install pressure roller cover (3) onto boomhead
assembly (9) and secure using screws (4, 5) and
washers (6).
GO TO NEXT PAGE
2-137