TM 55-1680-320-23 & P
2-64. DRUM ASSEMBLY - ALIGN
2-64
This task covers: Alignment
INITIAL SETUP
Personnel Required:
and Drum Timing
67N, UH1 Helicopter Repairer
67T, UH60 Helicopter Repairer
Parts/Materials:
Loctite Compound (Item 16, App. D)
Lockwire (Item 18, App. D)
Tools and Test Equipment:
Tool Set, Aviation Unit Maintenance
NSN 4920-00-567-0476
Tool Kit, Aircraft Mechanic
NSN 5180-00-323-4692
Auxiliary Power Unit (APU)
Cable Spool, 42277-730 or equivalent
Equipment Condition:
Hoist installed in assembly stand
Equipment Condition Para:
Task 2-5
References:
None
Rescue hoist cable cutter contains an
explosive cartridge. Use extreme care
when handling to prevent injury to
personnel. Static producing clothing
prohibited. Install piece of aluminum
foil between cartridge pins when
disconnecting harness.
NOTE
Drum assembly alignment consists of
adjusting the clearance between the
cable assembly and the cable cutter.
Alignment procedures are normally
performed after replacement of the
cable drum and cover assembly.
1. Disconnect cable cutter harness (1) from cable cutter
(2).
GO TO NEXT PAGE
2-135
