TM 1-1730-213-13&P
0005 00
OPERATING PROCEDURES - CONTINUED
Figure 2.
Jack Assembly.
RAISING
1.
Loosen iller hole (Figure 1, Item 33) and tighten valve (Figure 2, Item 11).
2.
Actuate handle (Figure 2, Item 1) to raise load.
LOWERING
1.
Slowly open valve (Figure 2, Item 11) until desired lowering rate of speed is obtained.
2.
After ram is completely lowered, close iller hole (Figure 1, Item 33), valve body (Figure 2, Item 11), and lower
extension screw (Figure 1, Item 15).
END OF WORK PACKAGE
0005 00-3/4 blank