• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Ram and Reservoir Assembly.
OPERATION UNDER UNUSUAL CONDITIONS

ENGINE AND TRANSMISSION OILS, FUELS AND ADDITIVES FOR ARMY AIRCRAFT
Page Navigation
  7    8    9    10    11  12  13    14    15    16    17  
img
TM 1-1730-213-13&P
0005 00
OPERATING PROCEDURES - CONTINUED
Figure 2.
Jack Assembly.
RAISING
1.
Loosen iller hole (Figure 1, Item 33) and tighten valve (Figure 2, Item 11).
2.
Actuate handle (Figure 2, Item 1) to raise load.
LOWERING
1.
Slowly open valve (Figure 2, Item 11) until desired lowering rate of speed is obtained.
2.
After ram is completely lowered, close iller hole (Figure 1, Item 33), valve body (Figure 2, Item 11), and lower
extension screw (Figure 1, Item 15).
END OF WORK PACKAGE
0005 00-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.