• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Jack Assembly.
Ram and Reservoir Assembly.

ENGINE AND TRANSMISSION OILS, FUELS AND ADDITIVES FOR ARMY AIRCRAFT
Page Navigation
  5    6    7    8    9  10  11    12    13    14    15  
img
.
TM 1-1730-213-13&P
0005 00
OPERATOR INSTRUCTIONS
HAND TRUCK (HIGH PRESSURE NITROGEN SERVICING CART)
OPERATING UNDER USUAL CONDITIONS
INITIAL SETUP:
NA
SECURITY MEASURES FOR ELECTRONIC DATA
NA
OPERATING PROCEDURES
NOTE
It is essential the operator be able to perform every operation of which the tripod hydraulic jack
is capable.
POSITIONING
The ground surface under the jack shall be level. If the ground is soft, a board shall be placed under each foot.
The jack shall be placed so that a line drawn through the center of two of the feet is parallel to the fuselage of
the airplane or load to be lifted.
0005 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.