0016 00
TM 1-1670-260-12&P
__________________________________________________________________________________________
(2) Position mid-point of green/white sling (2), View A, under 4 oclock position main rotor blade retention
assembly. (View C)
(a) Ensure sling does not cross itself at any point.
(b) Bring sling eyes together.
(3) Position mid-point of green/white sling (3), View A, under 8 oclock position main rotor blade retention
assembly. (View C)
(a) Ensure sling does not cross itself at any point.
(b) Bring sling eyes together.
(4) Position mid-point of green/white sling (4), View A, under 10 oclock position main rotor blade
retention assembly. (View C)
(a) Ensure sling does not cross itself at any point.
(b) Bring sling eyes together.
c. Carefully lay sling eyes for green/white slings (1), (2), (3), and (4) on the helicopter for easy access during the
crossbar installation.
d. Insert OH-58D sight wedge (5), View A, and Figure 2 as follows:
(1) Place a hand on top of the mast-mounted sight (MMS).
(2)
With the free hand, orient the sight wedge (Figure 2) so that the pointed side is facing the MMS mast
and with the long flat side facing down.
(3)
Slowly insert the sight wedge into the opening on the lower front face of the MMS.
Figure 2. Sight Wedge Assembly
0016 00-6
