0016 00
TM 1-1670-260-12&P
__________________________________________________________________________________________
0016 00-16
Following post recovery component maintenance all UMARK components shall be repacked into the UMARK
containers in a neat and orderly fashion. The UMARK containers should then be secured and stored for the next
aerial recovery mission.
12. POST RECOVERY DISABLED HELICOPTER PROCEDURES
Before returning helicopter to flight status inspect in accordance with applicable technical manuals and perform
the following:
a. Remove and return the engine and transmission driveshaft flex frame (K-flex) coupling to the manufacturer for
inspections.
b. Replace tail rotor blades in accordance with applicable technical manual.
c. Contact Commander, U.S. Aviation and Missile Command.
END OF WORK PACKAGE