TM 55-1680-320-23&P
2-17. BOOM HEAD ASSEMBLY - INSPECT
2-17
This task covers: Inspection
INITIAL SETUP
Personnel Required:
Equipment Condition:
67N, UHl Helicopter Repairer
Hoist installed in helicopter or assembly stand
67T, UH60 Helicopter Repairer
Parts/Materials:
Equipment Condition Para:
None
Task 2-5
Tools and Test Equipment:
References
None
None
1. Inspect boom head assembly for nicks, cracks, scratches and dents. Inspect for corrosion. (Refer to Task 2-11).
2. Inspect for evidence of oil leakage.
3. Inspect cable cutter and switch harness assembly for cuts, tears, fraying and broken insulation.
4. Inspect electrical connectors for bent, broken and missing pins. Check for crossed, stripped and darnaged threads.
5. Inspect identification and lubrication plates for legibility and security of attachment.
6. Check boom head for freedom of movement.
7. Check boom head fluid level.
FOLLOW-ON MAINTENANCE:
Repair boom head assembly
(Task 2-19)
END OF TASK
2-48 Change 4