TM 55-1680-320-23&P
Change 8 3-53
3-15. BOOM HEAD ASSEMBLY - REPAIR
3-15
This task covers:
Disassembly, Cleaning, Inspection, Repair and Reassembly
INITIAL SETUP
Personnel Required:
Equipment Condition:
67N, UH1 Helicopter Repairer (2)
67T, UH60 Helicopter Repairer (2)
Hoist installed in assembly stand
Boom head assembly removed.
Parts/Materials:
Equipment Condition Para:
Abrasive Cloth, Aluminum Oxide (Item 1,
App. D)
Adhesive RTV-732 (Item 2, App. D)
Automatic Transmission Fluid (Item 3,
App. D)
Task 3-5
Task 2-20
Cleaning Solvent (Item 10, App. D)
Electric Braid (Item 11, App. D)
Heat Shrink Tubing (Item 26, App. D)
Packing, MS28775-013
Packing, MS28775-0156
Packing, MS83461-/1-127
Petrolatum (Item 19, App. D)
Shims, 49001C6
Pin Cotter, MS24665-359
Tools and Test Equipment:
References:
Tool Kit, Aircraft Mechanics,
Avionic Cleaning and Corrosion Prevention/Control
NSN 5180-00-323-4692
TM 1-1500-343-23
Shop Set, Intermediate Maintenance
NSN 4920-00-472-4183
Aircraft Electrical and Electronic Manual
TM 55-1500-323-24
Tool Kit, Electrical Repairer
NSN 5180-00-323-4915
Military Pyrotechnics
TM 9-1370-203-20 & P
Air Source, 35 psi
TM 9-1370-203-34 & P
Multimeter
GO TO NEXT PAGE
