TM 55-1680-320-23 & P
SECTION VI. PREPARATION FOR STORAGE OR SHIPMENT
2-68. PREPARATION FOR STORAGE OR SHIPMENT
2-68
This task covers: Inspection, Preservation, and Packaging
INITIAL SETUP
Personnel Required:
Equipment Condition:
67N, UH1 Helicopter Repairer (2)
Hoist installed in assembly stand
67T, UH60 Helicopter Repairer (2)
Boom head assembly drained
Winch assembly drained
Parts/Materials:
Equipment Condition Para:
None
Task 2-5
Task 2-18
Task 2-45
Tools and Test Equipment:
References:
Reusable Shipping Container, 42305R11
Preservation and Packaging
MIL-STD-1188
Material Condition Marking
MIL-STD-129
1.
2.
Inspection. Inspect hoist for damage in accordance with inspection criteria in Task 2-11. If hoist has been damaged,
report damage on a two material condition tags in accordance with MIL-STD-129. Attach one tag directly onto hoist.
Attach second tag to the outside of the reusable shipping container after installation of hoist. Ensure tags are secured
in such a manner that will afford maximum protection from handling and weather.
Preservation. Rescue hoist shall be preserved in accordance with MIL-STD- 1188, Level A.
GO TO NEXT PAGE
2-145