TM 55-1680-320-23 & P
2-12. RESCUE HOIST - TEST
2-12
This task covers: Testing
INITIAL SETUP
Personnel Rewired:
67N, UHl Helicopter Repairer
67T, UH60 Helicopter Repairer
Parts/Materials:
None
Equipment Condition:
Hoist installed in helicopter
Equipment Condition Para:
Task 2-5
Tools and Test Equipment:
References:
None
None
Testing of the rescue hoist consists of conducting operational performance check in accordance with Task 2-7.
FOLLOW-ON MAINTENANCE:
None
END OF TASK
2-42