TM 55-1680-320-23 & P
3-15. BOOM HEAD ASSEMBLY - REPAIR (cont)
3-15
aa.
ab.
ac.
ad.
ae.
af.
Release wiring harness (29) from main
housing assembly (39) by removing bolt (81),
washer (82) and nut (83).
Remove clamp (74) by removing bolt
(75), washer (76) and nut (77).
Remove clamp (78) from connector (79)
by removing screws (80).
Remove heat shrink tubing and electrical braid
from wiring harness (29).
Unscrew connector shell from connector (79).
Slide shell and insulator away from connector.
Remove pins from connector using a suitable
pin removal tool.
Carefully pull wiring harness (29) through
boom head assembly from actuator end of
housing.
GO TO NEXT PAGE
3-58