TM 55-1680-320-23 & P
3-4. SERVICE UPON RECEIPT OF MATERIAL(cont)
3-4
d. With a helper, lift hoist from shipping container.
e. Place rescue hoist on a suitable work surface (or in hoist assembly stand, Part Number 42277-808) for inspection.
2. Checking Unpacked Equipment.
a.
b.
c.
d.
Inspect the hoist for damage incurred during shipment. If the equipment has been damaged report the damage on
DD Form 6, Packaging Improvement Report.
Check the hoist against packing slip to see if shipment is complete. Report all discrepancies in accordance with
instructions of DA PAM 738-751.
Check all tags and forms accompanying the hoist to determine the reason (if any) for removal from service.
Do not remove any forms or tags that are attached to the hoist until unit is installed and ready for operation. When
installed, remove forms and tags and forward to Quality Control (QC) section.
FOLLOW-ON MAINTENANCE:
None
END OF TASK
3-3