0014 00
TM 1-1730-202-13&P
INSTALLATION
Install the pump assembly (WP 0002 00, Figure 1, Item 13) on the foot assembly (WP 0002 00, Figure 1, Item
1.
12) and secure the clamp assembly (WP 0002 00, Figure 1, Item 14).
Couple the hose assembly to the pump.
2.
3.
ADJUSTMENT
Screw the safety valve assembly down until the spring bottoms in the valve.
1.
Install the reservoir as described in assembly above and ll with oil (WP 0009 00).
2.
Place the pump in a holding xture or secure to a bench and attach a 5,000 psi pressure gage to the outlet at
3.
the bottom of the pump.
Tightly close the release valve and open the air vent at the top of the reservoir. Actuate the handle to force
4.
uid against pressure gage to check setting of relief valve. Relief valve should actuate between 2,200 and
2,400 psi.
Remove the pump from the reservoir and set the safety valve to operate in a similar manner at 1,950 to 2,150
5.
psi.
TESTING
1.
Operate the pump, fully extending the ram until pump bypass pressure is reached. Hold pressure against
2.
the load not less than fteen minutes. There should be no apparent settling.
END OF WORK PACKAGE
0014 00-4